NK Labod Drava Ptuj Seznam forumov NK Labod Drava Ptuj
Modri Kurenti
 
 Pogosta vprašanjaPogosta vprašanja   IščiIšči   Seznam članovSeznam članov   Skupine uporabnikovSkupine uporabnikov   RSS Feed   Registriraj seRegistriraj se 
 Tvoj profilTvoj profil   Zasebna sporočilaZasebna sporočila   PrijavaPrijava 




The Third-party Inspection and Expediting Service

 
Objavi novo temo   Odgovori na to temo    NK Labod Drava Ptuj Seznam forumov -> NK Drava
Poglej prejšnjo temo :: Poglej naslednjo temo  
Avtor Sporočilo
qczoomen



Pridružen/-a: 28.08. 2019, 08:41
Prispevkov: 1

PrispevekObjavljeno: 28 Avg 2019 08:43    Naslov sporočila: The Third-party Inspection and Expediting Service Odgovori s citatom

Process Supervision
• Casting & Forging
To be certain that casting/pipe inspection process follow proven procedures
• Heat Treatment
To be sure that heat treatment is done properly for all parts, that no portion of the product is overlooked
• Chemical Analysis & Mechanical Property Tests (and Non Destruction Test).To be certain that:
a) The pipe inspection tests are really carried out
b) Material certificates use actual test data
• Assembling
a) Check internal cleanliness prior to assembling
b) Check whether quantity, material and type of internal parts meet specification requirements
c) Check whether construction details of the assembled products comply with specific requirements of the customers, based on Customer's Technical Specification, and /or Customer Approved Drawing
• Pressure Test

a) Evaluate whether vendor's pressure test procedure documents meet the third party inspection company standards or client's requirements

b) Ensure that the medium components of pressure test meet standard requirements

c) Ensure that the pressure test equipment was calibrated

d) Ensure that the process of pressure test was in accordance with the procedure and standard

e) Check for leakage or calculate the leakage rate

f) Ensure that the duration of pressure test and pressure holding meets the standard requirements


• Paint Application
a) Inspect pre-processing and surface condition prior to each paint layer application
b) Measure thickness of each layer applied paint
c) Adhesive test
d) Check protection on un-paint area
• Dispatch
a) Check name-plates and third party inspection company, tags
b) Check whether protections on each product are according to order
c) Check whether sort and construction of packing box/case are in accordance to order
d) Check marking on wooden case
e) Check whether documents in wooden case are according to order
f) Final quantity check
_________________
China third party inspection company
Nazaj na vrh
Poglej uporabnikov profil Pošlji zasebno sporočilo Obišči avtorjevo spletno stran
Pokaži sporočila:   
Objavi novo temo   Odgovori na to temo    NK Labod Drava Ptuj Seznam forumov -> NK Drava Časovni pas GMT + 1 ura, srednjeevropski - zimski čas
Stran 1 od 1

 
Pojdi na:  
Ne, ne moreš dodajati novih tem v tem forumu
Ne, ne moreš odgovarjati na teme v tem forumu
Ne, ne moreš urejati svojih prispevkov v tem forumu
Ne, ne moreš brisati svojih prispevkov v tem forumu
Ne ne moreš glasovati v anketi v tem forumu


MojForum.si - brezplačno gostovanje forumov. Powered by phpBB 2.